Scaffolding Projects Sheffield
Your local scaffolding company covers a number of projects in and around South Yorkshire.
The projects can vary from small residential projects to large commercial sites.
Scaffolding Project In Coventry
Client: The Railway Hotel
Location: Coventry
Description: Retention design scaffold structure.
Gantry/walk way over the “grinton beck”
Client: Bridge Inn Public House
Location: Richmond, North Yorkshire
Temprary Roof & Scaffolding: Sheffield City Centre
Client: Bull Hotel
Location: Bull Hotel, Horncastle
Gable end wall Collapsed due to high winds. Re-action time 24 hours on site.- watertight within 5 days. Included temporary roof, external independent, buttress scaffold, internal support/propping scaffold.
Scaffold Erection: Sheffield City Centre
Client: Sheffield City Council
Location: Hurfield Dentist, Sheffield
Local scaffold doing what they do best.
Temporary Roof: Hurfield Dentist
Client: Cp Construction Ltd
Location: Hurfield Dentist, Sheffield
Date: 01/10/2016
One of our regular clients requested a temporary roof scaffold for works to begin on the renovation of the Hurfield dentist in Sheffield. The client requested the temporary roof so they could remove the existing roof from the 1st floor, this allowed a additional floor to be installed creating 3 room operating theatres all works carried out under the temporary roof allowing the contractor to keep to there tight programme .
New build Project in the heart of the Sheffield:
Client: QW Roofing and building maintentance
Location: Sheffield City Centre
Date: 2016
This project was a real but exciting challenge, Local scaffold service had all RAMS approved materials on site and labour erecting scaffold within the 48hours.
One of the HGV’s fridge unit had a electrical fault which escalated into a full on furno, devastating a total of 10 HGV’s and trailers – leaving total carnage. Tony Naylor, who works direct for sainsbury’s was in charge of the project and called LSS to erect a independent scaffold 55m x 10 lifts to create a barrier from the outside elements, while internal work was carried out. £15million was the cost of this fire damage. Even though we were based over 120 miles from site, Tony knew exactly what he was getting with us.
Domestic Access Tower
Client: Pro-property plus
Location: Sheffield
Date: 2016
This boiler flue needed replacing, so we were asked to build this access tower, to provide a safe working platform.
Because of the location of the flue, the tower needed to straggle the ridge on the roof of the attached garage.
Scaffolding Project Kings-Lynn
Sainsbury’s:
Client: Sainsburys
Location: Kings-liynn
Date: Jan 2016
Scaffolding Project Dartford
Sainsburys – A.R. Naylor & Son’s
Client: Sainsburys, A.R Naylors & Son’s LTD
Location: Darford
Date: August 2016
After our track record with Sainsbury’s down in the capital over the last couple of years, Sainsbury’s maintainence department didn’t hesitate in call us up to assist in there scaffold requirements. This is the second largest distribution centre Sainsbury operate, the depot is only 5/6 years old and the fire curtain required immediate attention.
We ([email protected]) surveyed the job, and assisted Mr Tony Naylor from A.R. Naylor & Sons’s LTD (Based in Rotherham) to help Sainsbury’s and DHL with the programme of works by suggesting a number of valid option One of them was to install a 350kg hoist which would be a massive benefit in completing there tight schedule in time for the Christmas rush. We also advised to conduct the programme in a sequence of works, this allowed DHL to continue with there operations with minimal disruption. Sainsbury and DHL, delighted.
First phase completed a week early, Tony Naylor, Sainsbury’s and DHL delighted as the area of temporary works is so precious to them.
Scaffolding Project Charlton
Sainsbury’s Distribution centre: Fire Damage
Client: Sainsburys, A.R Naylors & Son’s LTD
Location: Charlton
Date: 2016
This project was a real but exciting challenge, Local scaffold service had all RAMS approved materials on site and labour erecting scaffold within the 48hours.
One of the HGV’s fridge unit had a electrical fault which escalated into a full on furno, devastating a total of 10 HGV’s and trailers – leaving total carnage. Tony Naylor, who works direct for sainsbury’s was in charge of the project and called LSS to erect a independent scaffold 55m x 10 lifts to create a barrier from the outside elements, while internal work was carried out. £15million was the cost of this fire damage. Even though we were based over 120 miles from site, Tony knew exactly what he was getting with us.